Dynamic load management
for housing company.
Same grid connection, more charging. KotiCharge's cloud-based load management tracks the building's electricity use in real time and shares the free power among the chargers — whatever the brand. The main fuses don't trip, and the housing company isn't locked into one manufacturer's equipment.
Without load management — fuses trip
Ten 22 kW chargers can draw up to 220 kW. At the evening peak, the main fuses overload.
Static load management — capacity goes unused
Chargers get a fixed power reserve sized for the worst peak. At night, when the connection has plenty of room, cars still charge slowly.
Dynamic load management — full capacity in use
Charging gets exactly the power that is free at any moment. In the evening, power is shared fairly; at night, cars charge at full power.
Real-time
monitoring of total building consumption
0
main fuses tripped by charging
22 kW
full charging power whenever there is capacity
Any
OCPP charger in the same load management — whatever the brand
Background
What is dynamic load management?
A housing company's electricity use varies throughout the day. Dynamic load management makes use of that variation: chargers use the power the rest of the building doesn't need at that moment.
Static load management
A fixed total power is reserved for the chargers at the switchboard and shared among the cars charging. The system doesn't know what the rest of the building is using, so the reserve must be sized for the worst consumption peak of the year — and most of the time, part of the capacity goes unused.
Dynamic load management
The building's total consumption is measured in real time at the main switchboard. Total charging power is raised when other consumption is low and cut as soon as it rises. The main-fuse limit is never exceeded, and the connection's full capacity is available for charging.
Example — daily load profile
Housing company of about 30 apartments, main fuses 3 × 100 A (approx. 69 kW)
Static limit, all day
12 kW
Dynamic at night, up to
~50 kW
Illustrative example. Safety margin 5 kW. Actual values depend on the building's grid connection and consumption.
22 kW chargers
22 kW chargers + dynamic load management
Most chargers support 22 kW, and charging speed is usually limited by the car. Ten cars charging at once would still need 110–220 kW — more than the entire grid connection of most housing companies.
Example — 10 × 22 kW chargers, overnight 10 pm–7 am
Overnight per car: ~11 kWh ≈ ~60 km of driving
Overnight per car: ~45 kWh ≈ ~250 km of driving
Calculated for the housing company in the previous example, with all ten cars charging all night. Consumption estimate 18 kWh/100 km. In reality, some cars fill up earlier, leaving even more power for the rest.
Solution
How KotiCharge load management works
EV charging load management runs automatically in the background. Neither the board nor the residents need to do anything.
Measurement
The building's total consumption is measured in real time at the main switchboard — per phase, so uneven loads are accounted for too.
Calculation
KotiCharge continuously calculates how much main-fuse capacity is free, leaving a safety margin for sudden load changes.
Power allocation
The KotiCharge cloud service distributes the free power to charging cars via OCPP — regardless of charger brand. When one car is full, its power moves automatically to the others.
Multi-level monitoring
Limits are monitored at the main-fuse, charging-group and individual-charger level, so no part of the electrical system is overloaded.
Plus: a power cap for peak hours
Besides protecting the main fuses, total charging power can be capped, for example between 7 am and 9 pm. EV charging then doesn't raise the building's power peak or the housing company's power charge — and any power charge that does arise is allocated to the residents who caused it.
Cloud-based OCPP load management
One load management system, many charger brands — on the same line
Chargers serve a housing company for 10–15 years, but individual models leave the market much sooner. KotiCharge load management runs in the cloud over the OCPP standard, so it isn't tied to any manufacturer.
Manufacturer's own load management
All chargers from one manufacturer — forever
- Load management only works between devices from the same manufacturer
- When a model is discontinued, compatible new chargers may no longer be available
- Expanding may require a separate charging group, its own power reserve or replacing the whole system
- The housing company can't freely put equipment out to tender
KotiCharge cloud-based load management
Always choose the best charger on the market
- Chargers from different brands on the same connection, under the same power limit and in the same load management
- Works with any charger that supports OCPP 1.6J or newer
- When a model is discontinued, any OCPP device can be your next charger
- Expand gradually — new charge points join the same load management
Example — one main switchboard, three charger brands
Main switchboard
3 × 100 A
One shared power limit
2022
Chargers A
6 units — original purchase
2025
Chargers B
4 units — model A no longer sold
2028
Chargers C
8 units — best price on the market
All 18 chargers share the same main-fuse capacity, and KotiCharge controls them as one system. The board doesn't need to worry whether compatible add-ons are still available for the old devices.
Supported chargers by brand →Benefits
Why dynamic load management pays off for housing companies
Main fuses never trip
Total charging power always stays within the connection limits — even on a freezing evening when saunas, stoves and heating are all on at once.
No costly connection upgrade
When charging power follows the actual free capacity, the existing grid connection often goes a long way — without connection fees or a switchboard renovation.
More charge points on the same connection
The charging system grows with the number of EVs. New charge points join the same load management, and each addition doesn't need to be re-sized for the worst-case peak.
Faster charging at night
When the rest of the building uses little power, chargers get many times more power than with a fixed limit. Cars are ready in the morning.
Keeps the power charge in check
A peak-hour power cap stops EV charging from raising the building's monthly power peak — and with it the housing company's electricity bill.
Different brands on the same line
Cloud-based OCPP load management controls chargers from different manufacturers on the same grid connection and under the same power limit. The housing company can always choose the best device on the market.
“Their multi-level load management keeps both the charging circuit and our campus main power line within safe limits at all times — an absolute requirement for us, given the critical equipment on site that cannot tolerate any downtime.”
Planning
Load management doesn't replace good planning — but it makes it pay off
Dynamic load management isn't magic. It doesn't create extra capacity — it puts to use what the connection already has. To get the full benefit, the charging cabling must have no bottlenecks, and the system should be sized for the future.
We work with certified electrical contractors, so you get charger installation, load management and operation from one place.
Meet our installation partnersChecklist for the board
-
Is the building's total consumption measured at the main switchboard?
Dynamic load management needs real-time measurement. Without it, you have static load management.
-
Will the system still work when half the cars are EVs?
Ask the supplier for a calculation where 50% — and later 100% — of parking spaces are used for charging.
-
Are there bottlenecks in the cabling?
Daisy-chained cable groups can prevent free capacity from being used, even when the connection has room.
-
Is load management tied to one charger brand?
If load management is the manufacturer's own, all future chargers must be bought from the same manufacturer. Cloud-based OCPP load management works with any brand.
Common questions
Frequently asked questions
What is dynamic load management?
What is the difference between static and dynamic load management?
Should a housing company install 22 kW chargers if it has load management?
Does load management slow down EV charging?
Can chargers from different brands share the same load management?
What happens if our charger model is discontinued?
Does load management help reduce the housing company's power charge?
Ready to make EV charging effortless for everyone?
Join housing companies and businesses across Finland who trust KotiCharge to handle billing, savings, and everything in between.
Average switching time from another operator: under 10 min · No disruption to residents
35
cities across Finland
500
charging locations
2000
chargers managed